Voltri Terminal Europa

Long-term ordinary and extraordinary maintenance, management and adaptation to regulations of terminal facilities (docks, service areas and buildings)

Genoa
2006 - ongoing

Voltri Terminal Europa

Long-term ordinary and extraordinary maintenance, management and adaptation to regulations of terminal facilities (docks, service areas and buildings)

Genoa
2006 - ongoing

Terminal Container MCT

Long-term ordinary and extraordinary maintenance, management and adaptation to regulations of MCT Terminal Container electrical systems

Gioia Tauro (RC)
2004 - ongoing

Stazioni Marittime S.p.A.

Maintenance of the technological systems of buildings in concession to Stazioni Marittime S.p.A

Genova
2010 - ongoing

CONDOMINIO TORRE SAN VINCENZO

Management of technological systems, air conditioning, heating, fire protection, water and sewer systems of Condominio Torre San Vincenzo

Genoa
2010 - ongoing

IKEA

Maintenance and servicing of electrical and mechanical systems for Ikea store and warehouse

Genoa
2013- ongoing

AMMINISTRAZIONE CENTRO DEI LIGURI

Ordinary and extraordinary maintenance (systems management) of thermal and air conditioning systems

Genoa
2002 - ongoing

Regione Liguria

Ordinary and extraordinary maintenance (systems management) of thermal and air conditioning systems

Genoa
2012 - 2016

Stazioni Marittime S.p.A.

HQ thermal systems energy efficiency

Genoa
2011

AUTORITÀ PORTUALE DI GENOVA

Implementation of the lighting system with light towers for the 6° module at VTE Terminal – Porto di Voltri

Genova
2011

Stazioni Marittime S.p.A.

External lighting systems energy efficiency with new LED technology lighting towers for Stazioni Marittime S.p.A

Genoa
2015

Aeroporto di Genova

Lighting design and revamping of lighting fixtures with LED technology in aircraft stands, way out tracks and outdoor parking

Genoa
2017

CAGLIARI INTERNATIONAL CONTAINER TERMINAL

Revamping of high-mast lighting systems with new LED technology in the CICT terminal area

Cagliari
2015 - 2017

LA SPEZIA CONTAINER TERMINAL

Revamping of high-mast lighting systems with LED technology

La Spezia
2016-2017

MINISTERO DELLE INFRASTRUTTURE E DEI TRASPORTI

Design and implementation of technological systems (electrical mechanical and water systems) at the Stazione Marittima di Genova – Ponte dei Mille

Genova
2007 - 2008

AUTORITÀ PORTUALE DI GENOVA

Design and implementation of MV/LV electrical systems for the 6° Module at the VTE Terminal – Porto di Voltri

Genoa
2008- 2010

AUTORITÀ PORTUALE DI VENEZIA

Cabina Vecon S.p.A. refurbishment works – Porto di Venezia, Mestre

Venice
2011

COMUNE DI PORTOFINO

MV/LV electrical systems refurbishment works at Molo Umberto I

Portofino (GE)
2012

Stazinoi Marittime S.p.A.

Design and implementation of technological systems for the Ponte dei Mille Cruise Terminal in Genoa

Genoa
2011 - 2014

EUROPA MULTIPOURPOSE TERMINALS

Electrical and mechanical systems production for the Molo VI in Porto di Trieste

Trieste
2011 - ongoing

Voltri Terminal Europa

Expansion of the Parco Reefer Porto di Voltri-Prà – Modul E, block 6 baie 1-11

Genoa
2013

EUROGATE TANGER S.A.

Executive and final design and implementation of technological systems (electrical, thermo mechanical and fire protection, data transmission and security systems) at Terminal Container TC2 (docks, service areas and buildings)

Tangier (Marocco)
2007-2010

Voltri Terminal Europa

Electrification of wheeled cranes

Genoa
2016- in corso

Terminal Container MCT

Design and realization of plants at Terminal Container MCT (docks, service areas, buildings and reefers)

Gioia Tauro (RC)
2004 - 2017

INTERPORTO DI VADO LIGURE I.O.

Electrical systems implementation for Warehouses 1, 2, 3 and 10

Vado Ligure - SV
2016-2017

Interporto Padova S.p.A.

Implementation of automated gates for the roads and railways of the Parco Interporto in Padua

Padua
2018- ongoing

MBDA Italia S.p.A.

Implementation of electrical, lighting, stoplight, electrostatic discharge protection, telephone, fire detection, intrusion detection and CCTV systems at the Aulla site

Rome
2002 - 2004

MINISTERO DI GRAZIA E GIUSTIZIA

Implementation of the intrusion detection system and perimeter protection and control system at the Scuola di Formazione del Personale di Polizia Penitenziaria Bicocca di San Pietro di Clarenza (CT)

Rome
2004-2005

AERONAUTICA MILITARE

Implementation n of special plant systems for the Stormo 7th Base – Aereonautica Militare di Grosseto

Grosseto
2005 - 2007

MINISTERO DELLE INFRASTRUTTURE E DEI TRASPORTI

Executive design and implementation of special plant systems, fire detection systems and sound alarm at the Santa Limbania Palazzo delle Dogane

Genoa
2009